A 1,000 room resort located on the beachfront in Punta Cana, Dominican Republic. Two Vulcan S500 were installed on the main input pipe in order to combat scale build up and increase efficiency of the three cooling towers. A Vulcan S100 is also installed on the resorts main hot water system, in order to remove and prevent scale build up in the heaters/boilers, which provide hot water throughout the entire resort and casino.
A 4 year field test of the Vulcan electronic descaler was conducted at a Mall’s cooling towers in Indonesia. During the 4 years no system maintenance was required and the system was not treated with chemicals. Mall administration and maintenance report the prevention of rust in their iron pipes has been an added benefit.
Page 1 of 5